Signed the lease, paid the deposit...oh crap now the hard work really begins!
Old 8th October 2005
  #121
Lives for gear
 
RichT's Avatar
 

And the new first floor and room beneath it has gone up, woohoO!
Attached Thumbnails
Signed the lease, paid the deposit...oh crap now the hard work really begins!-new-1st-floor.jpg  
Old 8th October 2005
  #122
Lives for gear
 
RichT's Avatar
 

The platform for the new steel staircase to the control room has been put up too...
Attached Thumbnails
Signed the lease, paid the deposit...oh crap now the hard work really begins!-platform-stairs.jpg  
Old 8th October 2005
  #123
Lives for gear
 
RichT's Avatar
 

And construction on the outer wall of the rehearsal rooms has begun...
Attached Thumbnails
Signed the lease, paid the deposit...oh crap now the hard work really begins!-outerwall.jpg  
Old 8th October 2005
  #124
Lives for gear
 
RichT's Avatar
 

This shot was taken inside the newly created solo rehearsal / teaching room which is directly under the control room...
Attached Thumbnails
Signed the lease, paid the deposit...oh crap now the hard work really begins!-solopracticeroom.jpg  
Old 8th October 2005
  #125
Lives for gear
 
RichT's Avatar
 

We're planning to put a small office underneath the stairs, this pic is looking up through the platform. We're also putting a small machine 'cupboard' opposite the entrance to the control room.
Attached Thumbnails
Signed the lease, paid the deposit...oh crap now the hard work really begins!-officespacelookingupthroughplatform.jpg  
Old 13th October 2005
  #126
Lives for gear
 
RichT's Avatar
 

Soooooooooooo, more pictures, more progress (supposedly).

We've starting putting up the resilent channel that we'll fix the plasterboard ceiling to. It's very fiddly, takes about an hour to get four bits up.
Attached Thumbnails
Signed the lease, paid the deposit...oh crap now the hard work really begins!-resilient-channel.jpg  
Old 13th October 2005
  #127
Lives for gear
 
RichT's Avatar
 

We've started on the wall details too - hessian stapled into the gap between the double walls. Looks pretty damn pro even if Mark does say so himself...
Attached Thumbnails
Signed the lease, paid the deposit...oh crap now the hard work really begins!-hessianinbetweendoors.jpg  
Old 13th October 2005
  #128
Lives for gear
 
RichT's Avatar
 

We tested the air conditioners today. They work great but they're VERY VERY LOUD!!! So, we'll have to look at sound proofing the room these babies are going to sit in.
Attached Thumbnails
Signed the lease, paid the deposit...oh crap now the hard work really begins!-aircontest.jpg  
Old 13th October 2005
  #129
Lives for gear
 
RichT's Avatar
 

A shot of the vents sited in the rehearsal room - top one for hot air in, bottom one for cold air out. We've sited a fresh air inlet at the opposite end of each room as well.

The machines work great as I say, the 'suck' inlet holds a piece of paper to the vent and the 'blow' outlet blows the paper away. Success!
Attached Thumbnails
Signed the lease, paid the deposit...oh crap now the hard work really begins!-ventsinplace.jpg  
Old 14th October 2005
  #130
Lives for gear
 
Nutmeg II.'s Avatar
 

Quote:
Originally Posted by RichT
...top one for hot air in, bottom one for cold air out...
I always thought it's the other way around?!
-for heating: bottom in, top out. (freshhot air floating from bottom to top and used warm air on top gets sucked out)
-for cooling: top in, bottom out. (fresh cool air falling from top to bottom colling the top part of the room)

But what do I know?
Old 14th October 2005
  #131
Lives for gear
 
RichT's Avatar
 

Quote:
Originally Posted by Nutmeg II.
I always thought it's the other way around?!
-for heating: bottom in, top out. (freshhot air floating from bottom to top and used warm air on top gets sucked out)
-for cooling: top in, bottom out. (fresh cool air falling from top to bottom colling the top part of the room)

But what do I know?
We worked on the following theory:

The cooled air drops into the bottom of the room, as it heats it rises to be sucked back through the hot air inlet and blown back out cooled through the cold outlet.

The fresh air pipe will make sure fresh air is fed into the room so we're not constantly recycling old air.

Cheers,
Rich
Old 17th October 2005
  #132
Gear Maniac
 

Quote:
Originally Posted by RichT
We worked on the following theory:

The cooled air drops into the bottom of the room, as it heats it rises to be sucked back through the hot air inlet and blown back out cooled through the cold outlet.

The fresh air pipe will make sure fresh air is fed into the room so we're not constantly recycling old air.

Cheers,
Rich
Nutmeg is right on this on. Stanard HVAC is as follows, when heat: bottom is supply, top is return, and when cooling: top is supply, bottom is return.

The idea is that (when cooling) the cold air falls from the top, cooling off the room as it falls. The return grabs cooler air from the floor, and intern your AC doesn't have to work as hard to cool that air in order to cool the room. If you do it reverse, you'll have ice cold air at your feet, and sweltering air by your head. You're relying on vaccumm theory to circulate the air in your room. This can be troublesome if a door is open. Don't fight physics, use it!
Old 17th October 2005
  #133
Lives for gear
 
RichT's Avatar
 

Quote:
Originally Posted by Sender
Nutmeg is right on this on. Stanard HVAC is as follows, when heat: bottom is supply, top is return, and when cooling: top is supply, bottom is return.

The idea is that (when cooling) the cold air falls from the top, cooling off the room as it falls. The return grabs cooler air from the floor, and intern your AC doesn't have to work as hard to cool that air in order to cool the room. If you do it reverse, you'll have ice cold air at your feet, and sweltering air by your head. You're relying on vaccumm theory to circulate the air in your room. This can be troublesome if a door is open. Don't fight physics, use it!
Ah, ok, when you put it like that. (And an air con engineer friend of ours finally told us too)

It's no trouble to switch the supply feeds so thats what we'll do.

Cheers!

Rich
Old 20th October 2005
  #134
Lives for gear
 
RichT's Avatar
 

Time...is NOT on our side, no it ain't!

First ceiling board went up!
Attached Thumbnails
Signed the lease, paid the deposit...oh crap now the hard work really begins!-firstceilingboardup.jpg  
Old 20th October 2005
  #135
Lives for gear
 
RichT's Avatar
 

Then no sooner had the first board gone up then the job was finished (yeah right!)

Ceiling has been acoustically sealed, just needs another layer of board screwed up, sealed and then finished with paint or some such.
Attached Thumbnails
Signed the lease, paid the deposit...oh crap now the hard work really begins!-ceilingfinished.jpg  
Old 20th October 2005
  #136
Lives for gear
 
RichT's Avatar
 

The fresh air fans have been sited at the back of the building...

(No ducting yet!)
Attached Thumbnails
Signed the lease, paid the deposit...oh crap now the hard work really begins!-freshairfans.jpg  
Old 20th October 2005
  #137
Lives for gear
 
RichT's Avatar
 

We're going up in the world! (Des's joke) The stairs are in!
Attached Thumbnails
Signed the lease, paid the deposit...oh crap now the hard work really begins!-stairs1.jpg  
Old 20th October 2005
  #138
Lives for gear
 
RichT's Avatar
 

Another stair shot...

Where the bannister / guard rail is at the top of the stairs is where we are building our computer and amp room (well, cupboard!).
Attached Thumbnails
Signed the lease, paid the deposit...oh crap now the hard work really begins!-stairs2.jpg  
Old 20th October 2005
  #139
Lives for gear
 
RichT's Avatar
 

Arty stair shot... yeah ok, they're getting boring now I know but they did cost a lot of money so lets make the most of it heh
Attached Thumbnails
Signed the lease, paid the deposit...oh crap now the hard work really begins!-stairs3.jpg  
Old 20th October 2005
  #140
Lives for gear
 
RichT's Avatar
 

View from the landing over rehearsal room 2. Rockwool is soon to go in the grid and the top layer of ceiling to be applied.
Attached Thumbnails
Signed the lease, paid the deposit...oh crap now the hard work really begins!-topofceilingfinished.jpg  
Old 20th October 2005
  #141
Lives for gear
 
RichT's Avatar
 

View from the landing of the control room and studio area (still to be built!)
Attached Thumbnails
Signed the lease, paid the deposit...oh crap now the hard work really begins!-firstfloor.jpg  
Old 20th October 2005
  #142
Lives for gear
 
Dangerous Dave's Avatar
 

looking good bro!

Keep up the good work thumbsup

Bet you are knackered tho eh ?
Old 20th October 2005
  #143
Lives for gear
 
joaquin's Avatar
 

Congrats Rich!! The palce is coming out awesome!! thumbsup
Thanks for keeping us up to date................Joaquin.
Old 20th October 2005
  #144
Lives for gear
 
RichT's Avatar
 

Quote:
Originally Posted by Dangerous Dave
looking good bro!

Keep up the good work thumbsup

Bet you are knackered tho eh ?
Cheers dude.

I'm physically and mentally drained. Really and totally. I know there are tougher things you can do in the world but for me, right now, this is the toughest thing I've ever done.

Recording clients are booked in from December 5th and then there's no stopping until March.

Hope we're ready for 'em...
Old 24th October 2005
  #145
Lives for gear
 
RichT's Avatar
 

Our last week in the old studio and we've closed the business for a week, we reopen in the new place on November 1st, we aim to have the place tidy and one rehearsal room fully functioning, then the week after that two rehearsal rooms then a couple of weeks after that, the studio...yikes!

Here's the first rehearsal room we'll be finishing. It's fully sealed, sanded and just waiting for a coat of paint, the floor to go in, electrical points, lighting, doors and door seals. Piece of cake!
Attached Thumbnails
Signed the lease, paid the deposit...oh crap now the hard work really begins!-rehearsalroom2.jpg  
Old 24th October 2005
  #146
Lives for gear
 
RichT's Avatar
 

The outer wall of the rehearsal rooms has been stuffed and is being boarded up.
Attached Thumbnails
Signed the lease, paid the deposit...oh crap now the hard work really begins!-outerwall.jpg  
Old 24th October 2005
  #147
Lives for gear
 
RichT's Avatar
 

Oh and I forgot to introduce an extra room we'll benefit from, currently it's just some joists but it'll be an iso booth for amps and storage for mics, leads, etc.

It'll be floated on top of that platform.
Attached Thumbnails
Signed the lease, paid the deposit...oh crap now the hard work really begins!-isoboothmiccupboard.jpg  
Old 25th October 2005
  #148
Lives for gear
 
djui5's Avatar
 

Rich!!!!!!

Lookin incredible.

Now stop slacking and back to work
Old 25th October 2005
  #149
Lives for gear
 
studjo's Avatar
 

wow Rich - looks awsome as they say over there

Jo
Old 26th October 2005
  #150
Lives for gear
 
RichT's Avatar
 

Rehearsal room 2 painted and the floor frame starting to go down...
Attached Thumbnails
Signed the lease, paid the deposit...oh crap now the hard work really begins!-rehearsalroompainted2.jpg  
Post Reply

Welcome to the Gearslutz Pro Audio Community!

Registration benefits include:
  • The ability to reply to and create new discussions
  • Access to members-only giveaways & competitions
  • Interact with VIP industry experts in our guest Q&As
  • Access to members-only sub forum discussions
  • Access to members-only Chat Room
  • Get INSTANT ACCESS to the world's best private pro audio Classifieds for only USD $20/year
  • Promote your eBay auctions and Reverb.com listings for free
  • Remove this message!
You need an account to post a reply. Create a username and password below and an account will be created and your post entered.


 
 
Slide to join now Processing…
Thread Tools
Search this Thread
Search this Thread:

Advanced Search
Forum Jump
Forum Jump