View Single Post
Old 3rd December 2010
  #96
Lives for gear
 
AcoosticZoo's Avatar
Quote:
Originally Posted by Branko View Post
Here are some more pictures of today's situation:

The inner ceiling is done, the room is now closed from all sides. Walls and ceiling are in place and we'll be sealing them before moving on:

Attachment 206749

Between vertical studs, we nailed a layer of A1:

Attachment 206750

A handy tool for cutting the A1:

Attachment 206767

Joules is already beginning with basic cabling, by placing tubes inside the walls:

Attachment 206752Attachment 206753Attachment 206754

This tube is for the mixing desk:

Attachment 206755Attachment 206756

Nailing two layers of plasterboard separated by one layer of deadsheet to form the ceiling. Then covered with A1, nailed loosely:

Attachment 206757Attachment 206758

We used 50 Kg of nails for it:

Attachment 206759Attachment 206760

THE CREW:

JOULES
Attachment 206766

FERNANDO
Attachment 206765

MIGUEL
Attachment 206764

ANOTHER MIGUEL
Attachment 206761

VIKTOR
Attachment 206763

Next week, we'll be doing the machine room and the screen/loudspeaker wall. That's the plan, at least....
the links seem to be broken atm?
is anyone else experiecing this?

Regards
Josef Horhay
Mixing Engineer
www.acoosticzoo.com