View Single Post
Old 6th September 2010
  #29
Lives for gear
 
Branko's Avatar
General situation as of today September 6th:

Walls keep growing.
Horizontal concrete beams are dry.
We'll reach the 5m30 wall height in a week or so. Only after that we'll close the Dubbing Theatre with rear wall and build the projection and equipment Machine Room.
After that, we'll pour the concrete slabs and, while these are drying, begin the demolition of some existing walls on the first floor.
Some pictures of today's situation.
New rooms in Portugal-angled-low-pov.jpg
New rooms in Portugal-rec-studio-0609.jpg
New rooms in Portugal-wide-pov.jpg
New rooms in Portugal-low-wide-pov.jpg