Day two. Scaffolds and other tools were delivered and organized. Rockwool's being stored. Sylomer's been delivered, too.
We spent the afternoon measuring the space and drawing marks on the floor. Needless to say, some measures were adjusted to real conditions, most of them due to curvatures and shapes of existing structural floors and walls. We actually gained some 10cm of width to the Dubbing Theatre. At the same time, we lost some 30cm of height, but that won't be a problem, as we can comfortably reduce the space between the inner and outer ceiling to recover the lost space.
Later this afternoon, Murfor, a special wire reinforcement for masonry arrived. We will use it to increase the rigidity of all separation/isolation walls, and to prevent cracks that may appear later, due to their weight.