OK!

After an extremely exhausting weekend I am about 85% done. I was hoping to be done today BUT cleaning by myself was a lot longer than expected.
Sheetrock is a lot messier than imagined.

Here are some pics:



This was how the room started. 20ft X 20ft X 8ft.



We covered the whole garage door in insulation and thermal tape. From the outside the door was sealed off with concrete caulk and other stuff to make it airtight.



Black tar down on the floor for the frame, then we blew some concrete nails into it.