View Single Post
Old 28th June 2017
  #6
Gear Head
 

I then hired someone to do double 5/8 drywall on the walls. And single layer on the ceiling. The vents you see are for the ERV unit on the other side of the double wall, the storage section of the garage. I'm finally starting to see the end, but I was still pretty far from it.