Cad Factory Studio Build, Rural NSW, Australia

We lived in a warehouse in the inner city of Sydney for years. In this warehouse we had monthly gigs and exhibitions and did the odd recording.
We were the first underground warehouse space in the country to receive Presentation and Promotion Funding form The Australia Council for the ARTS.

CAD FACTORY ยป HOME

When we started there were hardly any of those types of spaces. Now they are springing up everywhere, so we thought it was time for a bit of a change.

So, we bought an old one room school house in the middle of rural NSW. About 6 hours from Sydney.

It was built in 1886 and operated as a school until 1959 or so.
It had one teacher and about 15-20 kids.

It was falling apart and we have slowly been fixing it up.

Now, we have actually moved down here.

We have just been successful in obtaining some more funding to run an artists residency program out here. This will involve us inviting out 4 different artists per year to work with the local community and or landscape to create work in the given genre. In the first year there will be a photographer, a dancer, a sound/installation artists and a painter.

One artist each year will be an international artist. on 2011 that international artist will be Bruce Odland from NYC who has just finished creating a Sound Design Garden in a theatre complex in Sweden with Laurie Anderson.

Anyway, that program will kick off in April 2011.

On top of that this studio is for ourselves to work in and for bands to come and stay and record in.

It is the realisation of a very big dream.

I live here with my wife and new born daughter. My wife is a musician also (she plays drums and piano).

That's the introduction, now I will post some photos
Viccy is offline   Reply With Quote
Old 30th January 2011   #2
Gear Head
 
Joined: Aug 2009
Posts: 61

Thread Starter
First Photos

THis building will host a CR, Live Room, Iso Booths, Lounge Room, Bathroom, Bedroom and Studio for My wife, Sarah. It is 210 Square Meters in total size. (21m x 10m)


Here you can see Graham Strong driving his tractor, or Grader I think it is called, from teh farm next door to level the site for the slab.




Here he is leveling the ground




We pored a seperate slab for each room. So the whole slab is actually made up of 5 smaller slabs



Laying out the shed components



Starting to put up the shed frame







As the build got held up for some time due to the floods in Regional NSW late last year, I had a rehearsal with Dancer Linda Luke scheduled in development for a performance in Sydney. We made do with what we had.



Viccy is offline   Reply With Quote
Old 30th January 2011   #3
Gear Head
 
Joined: Aug 2009
Posts: 61

Thread Starter
Power etc.


Digging a trench to run power to the studio.


Framing for Control Room. Although it doesn't look like it in this photo, the ceiling will be built flat.



That's all for now. More drawing of entire layout and photos to follow.
Viccy is offline   Reply With Quote
Old 30th January 2011   #4
Gear Head
 
Joined: Aug 2009
Posts: 61

Thread Starter
ooops

ooops
Viccy is offline   Reply With Quote
Old 30th January 2011   #5
Lives for gear
 
Joined: Jan 2011
Location: Ireland
Posts: 1,360

Hi Viccy,
Lookin forward to following your progress, best of luck with it!

Graham

(P.s congrats on the the new baby.)
Grahamdwc is offline   Reply With Quote
Old 31st January 2011   #6
Lives for gear
 
Joined: May 2009
Posts: 1,625

This looks to be a great project, with plenty of room to work with. Is your height is on the order of 3 to 4 meters?
Syncamorea is offline   Reply With Quote
Old 1st February 2011   #7
Gear Head
 
Joined: Aug 2009
Posts: 61

Thread Starter
Hi, Thanks for both of the messages.

The Shed height is 3.5 meters at the external walls and rises up to something like 4.5 meters in the middle.

We are looking at building the ceilings at about 3.35 or so.

I will have drawings of the space up soon.

The nearest house is about 3 or 4 km's away, except for our house which is about 30 meters away, so we jsut need to keep outside noises out of the studio really, and isolation between rooms.

Vic
Viccy is offline   Reply With Quote
Old 1st February 2011   #8
Gear Head
 
Joined: Aug 2009
Posts: 61

Thread Starter
And one of the most exciting parts is once this part of the construction is finished, we will install a disused Grain Silo as a Reverb Chamber !!!
Viccy is offline   Reply With Quote
Old 1st February 2011   #9
Lives for gear
 
Joined: Jan 2011
Location: Ireland
Posts: 1,360

Talking

Quote:
Originally Posted by Viccy View Post

The nearest house is about 3 or 4 km's away,

Vic
Oh Vic, i hope you know how lucky you are! :-)

Graham
Grahamdwc is offline   Reply With Quote
Old 2nd February 2011   #10
Gear Head
 
Joined: Aug 2009
Posts: 61

Thread Starter
Yes, the isolation is great in terms of noise, not so goo in terms of going to the shops in the middle of the night.

Today 170sq meters of 16mm FireShield Gyprock arrived.

This is the first of a number of deliveries.

Unloading


Pile 1


Pile 2
Viccy is offline   Reply With Quote
Old 3rd February 2011   #11
Gear Head
 
Guitarman28's Avatar
 
Joined: Feb 2009
Posts: 67

Looking good!
I can't wait to see this project unfold.
Cheers.
Guitarman28 is offline   Reply With Quote
Old 5th April 2011   #12
Gear Head
 
Joined: Aug 2009
Posts: 61

Thread Starter
Wow, It's been a really long wait trying to get the right equipment and people out here for the next par of the build. Lining the roof in 16mm firestop. There are no machines around to lift it this high, local tradesman don't want to do the job. It IS heavy stuff.

Then we have to build the ceiling with two layers underneath the roof.

But anyway, it looks like we have found someone, so this should hopefully move forward next week.

I have uploaded a drawing from John Brand which is the plan for the studio at this stage.

We will add an iso booth in the top "blind" corner of the CR.

WE are trying to keep the live room as large as possible and not have many smaller rooms as we want to keep the live room flexible enough to be used by dancers and different types of performers to develop new work in (soon I will start thinking about a load bearing sprung dance floor in the live room, but that's for another day.

The rooms at the bottom of the pic are accommodation (lounge/kitchen/bedroom/bathroom).

Okay, hopefully much more to post very soon.

Vic

Viccy is offline   Reply With Quote
Old 6th April 2011   #13
Gear addict
 
Joined: Oct 2002
Location: Adelaide, Australia
Posts: 377

I'm jealous. Hope all goes well.
Brenton is offline   Reply With Quote
Old 6th April 2011   #14
Gear nut
 
sineborg's Avatar
 
Joined: Mar 2011
Location: Singapore
Posts: 134

Wow, nice location. Looking forward to more build pics.
sineborg is offline   Reply With Quote
Old 8th April 2011   #15
Gear Head
 
Joined: Oct 2008
Posts: 36

Looks like an inspiring environment to plant a studio. Looking forward to more updates!
sandking782 is offline   Reply With Quote
Old 13th April 2011   #16
Gear Head
 
Joined: Aug 2009
Posts: 61

Thread Starter
Starting to line the Control Room walls

Today we started insulating and lining the double control room walls.

[IMG]http://i85.photobucket.com/albums/k7...m/IMG_0179.jpg[/IMG]

[IMG]http://i85.photobucket.com/albums/k7...m/IMG_0183.jpg[/IMG]

[IMG]http://i85.photobucket.com/albums/k7...m/IMG_0185.jpg[/IMG]

[IMG]http://i85.photobucket.com/albums/k7...m/IMG_0186.jpg[/IMG]

Didn't take very long to do this today. Only one layer so far, but will be double layer of 16mm Firecheck Gyprock

No time to do any more until next week, but the plan is to have the control room done by the end of the easter break coming up.
Viccy is offline   Reply With Quote
Old 22nd April 2011   #17
Gear Head
 
Joined: Aug 2009
Posts: 61

Thread Starter
Control Room Gyprocking and Insulation

oops accidently posted this message twice and can't seem to delete it.

Last edited by Viccy; 22nd April 2011 at 10:20 AM.. Reason: need to delete
Viccy is offline   Reply With Quote
Old 22nd April 2011   #18
Gear Head
 
Joined: Aug 2009
Posts: 61

Thread Starter
Control Room Gyprocking and Insulation

Photos from the last week.

It moves along.

In a pink fashion.

Pink insulation

Pink Gyprock (16mm Firestop)

A few cuts on the hand, pink flesh showing.

Layer one of 16mm gyprock going up with double insolated stud walls behind.

We need to finish the Control Room before moving on to the live room and booths.

The control room dimensions are approx 6.5m long x 5.5m wide and 3.07m high

In the mean time, we had our first artist residency at our old school house

Cad Factory Rural Residency Artist Blog










Closing up all the gaps




Starting Layer two !!

Viccy is offline   Reply With Quote
Old 23rd April 2011   #19
Gear Head
 
Joined: Aug 2009
Posts: 61

Thread Starter
In the meantime, in between building, we have just launched the first artist in our 4 artist per year residency program. 100 people travelled to our remote location to see the installation created by Mayu Kanamori and Myself during her three week residency inside the old Birrego School, a remote one room school built in 1886

The installation consisted of four projections and 2 sound installations within the school house.



Opening Night.

Viccy is offline   Reply With Quote
Old 26th April 2011   #20
Gear Head
 
Joined: Aug 2009
Posts: 61

Thread Starter
Control Room Sealed

Happily we were on the second last piece of 16mm gyprock for the ceiling. When the 16mm x 3m x 1.2m piece of gyprock about 3m in the air the lifter snapped and it came crashing to the ground.

Broken lifter.

No-one was injured and with some planning we managed to get the last two pieces up without the lifter (in smaller sections).

The Control Room is now all double lined with 16mm, all sealed up. The echo in there is absolutely huge.

Next we will start with the ceiling treatment.

Viccy is offline   Reply With Quote
Old 27th April 2011   #21
Lives for gear
 
Joined: May 2009
Posts: 1,625

Have you measured the CR dimensions now that the drywall is up?
Syncamorea is offline   Reply With Quote
Old 22nd May 2011   #22
Gear Head
 
Joined: Aug 2009
Posts: 61

Thread Starter
CR Dimensions

Quote:
Originally Posted by Syncamorea View Post
Have you measured the CR dimensions now that the drywall is up?
Yes, CR dimensions with Drywall up is 6340mm long x 5375mm wide x 3040mm heigh. Then there is a suspended ceiling for treatment which drops down to 2850.
Viccy is offline   Reply With Quote
Old 22nd May 2011   #23
Gear Head
 
Joined: Aug 2009
Posts: 61

Thread Starter
Ceiling Grid

Ceiling Grid Frame going up for acoustic treatment

Viccy is offline   Reply With Quote
Old 22nd May 2011   #24
Gear Head
 
Joined: Aug 2009
Posts: 61

Thread Starter
Control Room Framing



Viccy is offline   Reply With Quote
Old 24th May 2011   #25
Gear Head
 
Joined: Aug 2009
Posts: 61

Thread Starter
Cr Progress

Ceiling Grid going up ( insulation to go on top), lighting in.




At the last minute we decided to put a doorway in the western wall, so this is the start of cutting out the first double layer of 16mm gyprock and the first frame, will cut out the second frame and second layers of Gyprock on Thursday.



Eastern wall framing complete, ready for insulation, fabric, slats etc.

Viccy is offline   Reply With Quote
Old 24th May 2011   #26
Gear maniac
 
soulfield's Avatar
 
Joined: Jul 2005
Location: Dahlonega, Georgia
Posts: 242

Quote:
Originally Posted by Viccy View Post
And one of the most exciting parts is once this part of the construction is finished, we will install a disused Grain Silo as a Reverb Chamber !!!

Thats awsome!

A little John Bonham big drum sound.

I like it alot!

You will have a great place Sir!
__________________
Soulfield Studios

"What we do is, we go to eleven"

"Well, thats one louder"

http://www.soulfieldstudios.com/
soulfield is offline   Reply With Quote
Old 12th June 2011   #27
Gear Head
 
Joined: Aug 2009
Posts: 61

Thread Starter
control room update

Today I had my first even nail gun nail though the finger. Luckily I had just swapped to the small gun.

Insulation going into the absorption panels and slat panels



then covering in fabric



then painting slats



Putting Slats up



More Slats



More Slats other side



And finally for today, front panel slats mostly done.

Viccy is offline   Reply With Quote
Old 12th June 2011   #28
Lives for gear
 
AnthonyRochester's Avatar
 
Joined: Jun 2007
Location: somewhere in Tasmania
Posts: 1,263

looking great
AnthonyRochester is offline   Reply With Quote
Old 28th June 2011   #29
Gear Head
 
Joined: Aug 2009
Posts: 61

Thread Starter
Control Room continues

Control Room getting close







Viccy is offline   Reply With Quote
Old 30th June 2011   #30
Lives for gear
 
Joined: May 2009
Posts: 1,625

That's a wild looking slat wall. Very nice. I'm looking forward to seeing it completed!
Syncamorea is offline   Reply With Quote
New Reply New Reply Submit Thread to Facebook Facebook  Submit Thread to Twitter Twitter  Submit Thread to LinkedIn LinkedIn 



Thread Tools Search this Thread
Search this Thread:

Advanced Search

Similar Threads
Thread Thread starter Forum Replies Last Post
rural ambiances library Simplicisimus Post Production forum! 10 18th May 2010 08:07 PM
$1500 CAD to build a Pro Tools PC tigermuzik Music computers 2 19th October 2008 10:48 PM


All times are GMT +1. The time now is 11:45 AM.

Home - Search Forum - Contact Us - Terms Of Use - Advertise on Gearslutz - All Advertisers - Archive - Top
 
 
Powered by vBulletin®
Gearslutz.com LTD - UK Company Number 7597610.
Registered Office - 35 Ballards Lane, London, N3 1XW.
Hosted by Nimbus Hosting.

SEO by vBSEO ©2010, Crawlability, Inc.