| Lives for gear | Finally building my new place !!!! Hi everybody, finally then long and cold winter is over and we are ready to build my new studio. The building is located on the south of Slovakia in a village called Halic. I have bougth and old property with and old village house that was teared down and a new building will be built insted of it. Total space of the building is 113,2 m2 and the space will be divided this way: live room - 42 m2 control room 24m2 accomodation for 4 persons - 12,4 m2 kitchen - 6m2 shower and WC - 6m2 + a lounge of around 20m2 Progress so far - old building teared down - the new foundation is already digged out - we have drilled a small tunnel under the road for the new electricity cables
__________________ ------------------------------------------ David Kalosi www.morpheusmultimedia.sk www.myspace.com/morpheusmultimedia New studio build thread http://www.gearslutz.com/board/photo-diaries-recording-studio-construction-projects/378304-finally-building-my-new-place.html |
| | |
| | #2 |
| Lives for gear | We should start pouring the concrete next week - untill then sum supporting work needs to be done on the foundation so everything is ready for the pouring. We will need around 5 trucks of concrete for the whole foundation ![]() If everything will go according to the plan the masonry should start by the end of april - so we should see walls growing pretty soon. I have finally found a supplier for the floating floor rubber raisers and the sound proof doors for the studio itself. |
| | |
| | #3 |
| Lives for gear | Here are plans for the structure so you have and idea how it will look like ![]() |
| | |
| | #4 |
| Gear maniac Join Date: Feb 2008
Posts: 155
| Great project! I can't wait to follow the progression! |
| | |
| | #5 |
| Lives for gear | A quick easter update ![]() the concrete for the foundation has been poured last week, the 3 rows of the blocks will finish the existing foundation - this will be the "ground zero" of the building. they will be filled with concrete on tuesday, then the inside area will be levelled and prepared for the pouring of the concrete plate. the plate will be arround 15 cm bellow the top of the blocks to compensate for the height loss once the floating floors for the studio will be done. this way we wan't loose from the ceiling heigth. The interior will be divided into 2 sections - the studio itself that will be built on two separate concrete floating floors and the living and relax section. the floors of the second section will be levelled to the same height as the floating floors. - the living section will be heated with floor heating that will be built into the concrete. the foundation should be complete within 10 days and after that we can finally start building the walls ![]() |
| | |
| | #6 | |
| Gear maniac Join Date: Aug 2006 Location: Germany /Frankfurt
Posts: 225
| Quote:
I´m in Slovakia 4 weeks in june for buissnes reasons , in the area of Slate Moravce / Nitra I like Slovakia ;-) Where are you located? cheers mika | |
| | |
| | #7 | |
| Lives for gear | Quote:
I can be found either in bratislava - i assume you know where it is ) or in lucenec - it's around 150 km south east from nitra. the studio I am bulding is in a village 8 km from lucenec. thanks guys for the nice words ![]() | |
| | |
| | #8 |
| Lives for gear | The blocks are already poured with concrete, currently we are filling up the space inside with the remains of the old house to level the terrain inside the house. once it's levelled and compressed the final load of concrete can be poured for the plate and that's all regarding the foundation. according to the plan the whole foundation should be ready by next wednesday. it will be left around one week to dry completely and the masonry can start. the first load of around 25 pallettes should arrive by the end of the next week, total of around 55-60 palletes of blocks and glue will be used for the consruction of the perimeter walls. we will be using the new porfix plus blocks - PORFIX it's a new product with superb heat insulation mesures, the heat resistance of the 375mm block is R=4,21 m2K/W - so you don't need any additional insulation on the outside of the house, the only thing you have to do is the outside coating and the construction is done thumbsup and here are 2 pictures to sum um the progress ![]() |
| | |
| | #9 |
| Lives for gear Join Date: May 2007 Location: UK
Posts: 1,874
| Can't wait to see it emerge! |
| | |
| | #10 |
| Gear maniac Join Date: Mar 2009
Posts: 208
| WOW... Talk about building it from the ground up... Excited to see this progress. |
| | |
| | #11 |
| Lives for gear | I had meetings with the suppliers for the doors and windows (just for the building, the studio doors together with the KIP pads for the floating floors will be ordered from Alara-Lukagro Noise Control) and with the supplier of the roof construction. the tie-beams will be premanufactured and delivered to the construction site where they will be lifted with a crane directly on the building - should be pretty quick. I will be ordering them next week so they could be on site in 4-6 weeks depending on when the masonry will be done. I have attached the plans for the roof construction so you get the idea. Basically my main goal was to keep everything as simple as possible and simple is almost always the most cost effective solution. |
| | |
| | #12 |
| Lives for gear | Finally the foundation is completed thumbsup Next week we are starting to build the boundary walls - it should take around one month to complete the work on the walls. And of course a couple of pictures ![]() |
| | |
| | #13 |
| Lives for gear Join Date: Feb 2005 Location: Amsterdam
Posts: 1,716
| Aaaaaahhhhhh yes, nothing like the smell of a freshly poured slab! Good luck with it!
__________________ www.amsterdammastering.com |
| | |
| | #14 |
| Lives for gear | So here is a little sketchup preview of the next stage. While I am writing this the work on the walls has already begun, will upload some progress photos soon. |
| | |
| | #15 |
| Gear maniac Join Date: Aug 2006 Location: Germany /Frankfurt
Posts: 225
| Do you already have a floorplan for the studio? waiting for more pictures ![]() cheers mika |
| | |
| | #16 |
| PC Moderator | great, give us more details about the interior. cheers |
| | |
| | #17 | |
| Lives for gear | Quote:
the room sizes are 5,12m x 4,6 for the control room and 5,2m x 8,11m for the live room. those are empty room measures so the finished rooms will be smaller because of acoustics. Both rooms will be built on concrete floated floors with KIP pads under the concrete. Steel framing, 2 layers of drywall. The walls will be built using the IsoMax clips and the ceilings using the ICW hangers - all materials from kinetics. The studio itself is planned for stage 2 - currently I have to build the house first )) The interior works could begin somewhere in september if there won't be any major complications. | |
| | |
| | #18 |
| Lives for gear | Walls are going up. This should be pretty quick now since the blocks are huge. The roof beams are already being manufactured and they should be ready by the end of may. |
| | |
| | #19 |
| Lives for gear | Things are going really good at the moment, around 50% of the masonry is completed. 1) the accomodation for the customers 2) the future live room 3) control room 4) WC and shower 5) kitchen enjoy ![]() |
| | |
| | #20 |
| Lives for gear Join Date: May 2007 Location: UK
Posts: 1,874
| |
| | |
| | #21 |
| Lives for gear | |
| | |
| | #22 |
| Lives for gear Join Date: Oct 2006 Location: Atlanta, GA
Posts: 518
| Wow you are making a lot of progress in a short amount of time. I can't believe you did not want to do this project in the winter. ![]() |
| | |
| | #23 |
| Lives for gear | indeed it's very thin. the material we are using is designed especially for the blocks we are using and should be only 3-4 milimeters thick. so that's why you barely see any mortar on the pictures. The roof construction will arrive on the 12th of june, the windows and doors will be ready by the 2nd of june. So by the end of june we should have the building ready. |
| | |
| | #24 | |
| Gear interested Join Date: Mar 2009
Posts: 26
| Quote:
Hope you don't get any strong winds!stikeI'm sure you know what your doing,personally I'd be screaming at my builder if he was doing Block placement like that,isn't the principle of block placement evenly part of the physics of a stronger wall. I put jam on my sandwiches thicker than that mortar,Are you trying to make it stretch further..lol
__________________ | |
| | |
| | #25 | |
| Lives for gear | Quote:
![]() I have no reason not to trust in those products. It's all built to the specs supplied by porfix. If they say it's 4mm than I suppose there is a reason behind that. | |
| | |
| | #26 |
| Lives for gear Join Date: Jun 2008 Location: Greece, Athens
Posts: 660
| YouTube - YTONG kamin If it is similar product with AAC he is doing it fine. Great job morpheuzrecords I used the same material but mine are interior walls Nikolas |
| | |
| | #27 | |
| Lives for gear | Quote:
yes it's almost the same product, the 2 companies are major competitors here in slovakia since they make the same type of products. whe choose porfix because the blocks we are using are absolutely new - they were launched Q1 2009 - they are lighter than the ytong and thus they can cary more load. the heat isolation is far beter too and they are a bit cheaper as well. | |
| | |
| | #28 |
| Gear interested Join Date: Mar 2009
Posts: 26
| I was joking,as I said, I'm sure you know what your doing.it was meant in a light hearted manner. |
| | |
| | #29 |
| Gear interested Join Date: Apr 2009
Posts: 14
| |
| | |
| | #30 |
| Lives for gear | all the masonry done and the upper rim is poured with concrete - so we are ready for the roof construction that will take place next week probably.for all the "qualified" builidng engineers: the blocks still hold together ![]() it's amazing to see that 1/3 of all the posts I have received are about the collapse of the structure. really thanks for all the support guys thumbsup pics later |
| | |
New Reply
Facebook
Twitter
LinkedIn
| Thread Tools | Search this Thread |
| Similar Threads | ||||
| Thread | Thread starter | Forum | Replies | Last Post |
| any place to tryout Vintage synths in one place? | TacosWhenTwisted | Electronic Music Instruments & Electronic Music Production | 1 | 1st February 2009 05:04 PM |
| Building a new place... need help. | jeronimo | Studio building / acoustics | 20 | 16th September 2008 09:21 PM |
| Building a desk..what order would you place your gear? | wyattt | So much gear, so little time! | 0 | 11th October 2007 03:33 PM |
| Building a desk..what order would you place your gear? | wyattt | Low End Theory | 0 | 11th October 2007 03:32 PM |
| Building new home, mostly studio, what type of building is best? | FOURTHTUNZ | High end | 0 | 29th March 2006 05:31 PM |
| |