Quote:
|
Duffster Well, the floating floors have dried and already proved their worth. A worker was using a sledge hammer on the concrete floor about five feet from me and I couldnīt feel a thing. This week the air conditioning units go in, after that the burnt concrete floors, and the acoustics on the studio start. I am hoping that all will be ready in about a month and a half. The studio will actually be working before the rest of the bulding is done.
|
WOW im over 5 months into my build
and still a long ways to go...........
