The floating floors were installed today!!!. This was incredibly cool to watch, and in five days the liquid will harden and I can start building the studio. The electrical has been started and the acoustic designer has everything ready for the studios acoustic construction to get started. Isolated floors will be placed in the other two studios and the treated concrete floors will come in two weeks if things work out.