Approaching the end of week 3, here's the actual situation:
walls are now 2,5 m high and we'll be pouring one horizontal beam, to reinforce the structure of every wall. A smaller beam was placed above the window opening, and tomorrow we'll do the same for the door between the corridor and the Recording Studio.



I measured the dimensions of the rooms once again, to confirm we're on the right track and to fine tune the drawings of the acoustical shell, which we're going to start as soon as slabs are finished.