Sparks are flying inside and out. Hat Channel is being cut in preparation for putting up the ceiling drywall in the Music Room:
Outside we set the steel for the Annex roof. Here's some fire-cutting action:
And the happy result at the end of the day:
I'll give more of the blow-by-blow on my blog this weekend.