Just a shot of the concrete wall before the sheetrock ,
This Framed wall Is set 7" away from the existing wall and will only get one layer of sheetrock because it is 8" thick concrete ! so this will be the easy wall

The back wall where the rollup door is is also concrete and i will remove the door and fill in the space with drywall and then build another wall 12" or more away from it . im waiting till the last of the big deliveries are here to build that wall.
I also would love to have the console moved through the rollup door but the timing may not workout that way.

steve
Attached Thumbnails
Steve's new Recording Studio from the start-ins.-concrete-wall-small-.jpg  