View Single Post
Old 23rd November 2009   #19
mistervenable
Gear nut
 
Join Date: Aug 2008
Location: Nashville
Posts: 129

Thread Starter
New progress on the studio:

Pic 1: Installing the Ready Acoustics bass traps in the corners of the room.
Pic 2: Screwing hooks in the ceiling in the control room for the clouds.
Pic 3: Cloud 1. You can see the new thermal blackout curtains here.
Pic 4: It's cloudy in the control room now
Pic 5: Another shot, looking into the lounge area
Pic 6: Completed wall in the tracking room
Pic 7: The lounge, currently a junk room.
Pic 8: The new rack, with the patch bays installed
Pic 9: Putting the gear in the new rack
Attached Thumbnails
New Studio Construction - Franklin, TN-download-1.jpg   New Studio Construction - Franklin, TN-download-2.jpg   New Studio Construction - Franklin, TN-download-3.jpg   New Studio Construction - Franklin, TN-download-4.jpg   New Studio Construction - Franklin, TN-download-5.jpg  

New Studio Construction - Franklin, TN-download-6.jpg   New Studio Construction - Franklin, TN-download-7.jpg   New Studio Construction - Franklin, TN-download-8.jpg   New Studio Construction - Franklin, TN-download-9.jpg  
mistervenable is offline   Reply With Quote