View Single Post
Old 3rd November 2009   #2
mistervenable
Gear nut
 
Join Date: Aug 2008
Location: Nashville
Posts: 129

Thread Starter
The first picture is the front of the studio... basically the tracking room is on the left, and the control room on the right.

The second pic is looking at the partial wall, which we are ripping down, while standing in the tracking room, looking toward the control room.

The third pic is from the control room, looking into the tracking room... the other side of the partial wall (with a drawing desk installed)... say bye bye.
Attached Thumbnails
New Studio Construction - Franklin, TN-studio1.jpg   New Studio Construction - Franklin, TN-studio2.jpg   New Studio Construction - Franklin, TN-studio3.jpg  
mistervenable is offline   Reply With Quote