
Floor all laid down! Looking great! Looks different depending on how much light the camera had available to it.

Floor Trim Installed along with cable covers for network cable.

Door *edit* (almost) Finalized with door closer. I love the closer. Door got a lil dirty trying to find out the right pressure for the seals / lock. We did put the trim on the hinge side of the door now. Looks better.
Well these are all the pics I have at the moment... until I clean up the studio from my move in and mount my absorption panels. Big props to my father-in-law for helping me build this, as some days he was able to work w/o me there.
I'm still finding home depot, lowes, and other misc receipts everywhere. Total build out material cost was ORIGINALLY estimated at $1300, however all the lil things started to add up. Better hinges, green glue, extra long cement screws, subpanel, better lighting, nice paint, better laminent, total material cost I suspect is around $2500. I paid my father in law as well for his labor, which was another $3000 or so.