
used 1 layer of R30 insulation for bewteen the inerior of the studio wall and the garage door

Studs on the inner right wall

View from the inside of the studio looking into the garage. At this point, it was a pain in the ass to work in there because of all the fiberglass in the air.

Outside wall (between the studio and garage door) went up and then next was the first set of studs for the back wall.

First layer of drywall up. Yes it was very dusty that day.

Hole for the A/C. Helped cool down the room while working init. Also shows that the electric romex is run across the top.

Finishing touches for the first layer of drywall around the door.

Used a durable sheet to keep the cool air in the room.