| I am focusing some attention on the slab now, I have one area of concern that I may need to cut into. There is a long crack that I can certainly fill with epoxy, but the ridge will need to be dealt with. I am thinking of cutting out a small section and filling it with epoxy but I am unsure of the "right" way to do this. Obviously cost is king here, but I certainly want to make sure it is done right. My main concern is that I will be framing a new wall right over this ridge as well as putting down laminate flooring when all drywalled. I am thinking there are areas I will need to re-surface as well. Thoughts? Ideas? Suggestions? We are putting up the joists tomorrow, excited!
Keith |