Time for another update.
The plasterboard is done and all the walls have bin treated with stucco/plaster to smooth them out.
The tiles in the kitchen are done, and the toilet is nearly done.
We also costructed a closet next to the kitchen for extra storage.
Next up are the speaker walls in the controle room and after that the wallpaper can go on the walls.
But first tings first, here are the pictures
