Hi everyone,
Well, the bamboo floors are finally going in. So far the installation has gone on without a hitch, and the floors look great. They actually match the RPG diffusers perfectly. The floor in the lobby, office, and part of the hallway, is cement. We decided to stain the cement in a red color, rather than installing bamboo. This is partly because those are heavy traffic areas, but it also adds to the industrial look Charlie has been going for.
The red cement actually looks very cool, and because it didn't stain consistently, it looks like we actually tried to make a pattern. The cement is mostly covered for the time being, but the photos will give you some idea of what I'm talking about.
Next, the soffit fabric will be installed. It is a big multi day job, and must be done just right. Once the fabric is in, the clouds can be installed. After that, most of the rooms are done except for a few finishing details.