Hi everyone,
Now that the drywall is finished, the guys are installing the frames for the acoustic treatment on the walls. The frames you see in the pictures will hold fabric wrapped Owens Corning 705, which will sit 2 inches off the wall. Each room will also have RPG FlutterFree on the walls as well. The RPG diffusers will be installed a little later.

After the wall panels are installed, work will begin on the soffits.

-Mike
Attached Thumbnails
Airshow Mastering New Studio Construction-dsc_7729.jpg   Airshow Mastering New Studio Construction-dsc_7730.jpg   Airshow Mastering New Studio Construction-dsc_7909.jpg   Airshow Mastering New Studio Construction-dsc_7905.jpg   Airshow Mastering New Studio Construction-dsc_7935.jpg  

Airshow Mastering New Studio Construction-dsc_7938.jpg  
Airshow Mike is offline   Reply With Quote