View Single Post
Old 18th July 2009   #53
Airshow Mike
Gear Head
 
Join Date: Jul 2008
Location: Virginia
Posts: 64

Thread Starter
Hi everyone,
Now that most of the electrical stuff has been run, the crew is busy filling the walls and ceilings with insulation. As soon as the insulation is in place, drywall will be installed.

The amount of fiberglass used is pretty amazing!

-Mike
Attached Thumbnails
Airshow Mastering New Studio Construction-dsc_7596.jpg   Airshow Mastering New Studio Construction-dsc_7598.jpg   Airshow Mastering New Studio Construction-dsc_7614.jpg   Airshow Mastering New Studio Construction-dsc_7627.jpg   Airshow Mastering New Studio Construction-dsc_7633.jpg  

Airshow Mastering New Studio Construction-dsc_7640.jpg   Airshow Mastering New Studio Construction-dsc_7661.jpg  
Airshow Mike is offline   Reply With Quote