Both doors are now installed - other than a little bit of work to the exterior of the vent, all building work is done!

The inside is getting plastered / skimmed on Monday, once that dries (3-4 days hopefully) I'll be able to crack-on and get it painted and lay the laminate flooring.

Finally the sparky will come and hook up the power, install the fuse board sockets and lights.

After that the gear can start getting moved in!

A few new pics:-
Attached Thumbnails
Simple Project studio construction-internal-door.jpg   Simple Project studio construction-internal-door-2.jpg   Simple Project studio construction-exterior-door-open.jpg   Simple Project studio construction-exterior-closed.jpg   Simple Project studio construction-full-locking.jpg  

Simple Project studio construction-bolts1.jpg   Simple Project studio construction-bolts2.jpg  
gollumsluvslave is offline   Reply With Quote