View Single Post
Old 10th July 2009   #46
Airshow Mike
Gear Head
 
Join Date: Jul 2008
Location: Virginia
Posts: 64

Thread Starter
Hi everyone,
Our awesome electrician Darby (and his crew) have begun their electrical install work.

We have also taken delivery of our new Equitech balanced power system. In the photos you will see the Wall Cabinet unit with the face plate on and off. The unit itself is very large and weighs a ton. The Equitech will provide balanced power for all of the audio gear, and everything else will run on standard power.

Our new lighting dimmers have also arrived. Below you can see one of the Lutron Electronics Grafik Eye units we will be installing in the studios. Some of the benefits of using the Lutron dimmers are that each engineer can save presets for the lights in their room. This also allows an artist to switch between mood lighting and task lighting at the touch of a button. Also, because the units are essentially a remote control, the transformers can be located down the hall and far away from the audio.

-Mike

P.S I will be away for a few days so I will answer any questions when I get back.
Attached Thumbnails
Airshow Mastering New Studio Construction-dsc_7321.jpg   Airshow Mastering New Studio Construction-dsc_7361.jpg   Airshow Mastering New Studio Construction-dsc_7363.jpg   Airshow Mastering New Studio Construction-dsc_7369.jpg   Airshow Mastering New Studio Construction-dsc_7386.jpg  

Airshow Mastering New Studio Construction-dsc_8004.jpg   Airshow Mastering New Studio Construction-dsc_7401.jpg   Airshow Mastering New Studio Construction-dsc_7419.jpg   Airshow Mastering New Studio Construction-dsc_7518.jpg   Airshow Mastering New Studio Construction-dsc_7351.jpg  

Airshow Mike is offline   Reply With Quote