We're moving fast and furious now. We hope to be in shakedown mode for the month of August so we're on track. Isolation room B is painted and mostly trimmed out. Here is the back wall of ISO B with acoustical treatment. That whole wall is pegboard with insulation behind it. This room is 15 x 20 and can easily fit a whole band.



Another view of the same room looking into the control room and ISO A.





Same room this time viewed from the control room.



Here is the view inside ISO A. The drums have arrived and have been put together but not set-up yet. That doesn't stop my 6 year old from banging out some beats though !


Here is the view outside of the studio. We're on 84 acres here in the Thousand Islands. With all of this rain the place is a giant rain forest.



More to come. Next time we will be firing up the soldering gun as well as continuing with trim. One more month of construction and then we can fire up the recording machine.