View Single Post
Old 20th January 2009   #28
vocomotion
Gear maniac
 
vocomotion's Avatar
 
Join Date: Aug 2002
Location: Chicago, IL
Posts: 285

Thread Starter
They finished putting up all the Resilient Channel (RC) and IsoMax clips yesterday. In the photos, the RC is the horizontal steel channels you see on the walls. They are mounted to the existing walls using IsoMax clips, which decouple the next layers of drywall from the underlying wall.

Today, the contractors are boxing in the steel beam that runs through the top of the control room with three layers of drywall. You can see the uncovered beam in one of the pics here. The electrician is coming in Wednesday to do the rough electrical work and the inspection (framing/electrical) is scheduled for Thursday at 10am. On Thursday at 7am, 120 sheets of drywall are being delivered as well.

--> freddie
Attached Thumbnails
VOCOMOTION - A Cappella Studio - Construction Thread-dsc_0114.jpg   VOCOMOTION - A Cappella Studio - Construction Thread-dsc_0115.jpg   VOCOMOTION - A Cappella Studio - Construction Thread-dsc_0116.jpg   VOCOMOTION - A Cappella Studio - Construction Thread-dsc_0117.jpg  
__________________
Freddie Feldman
VOCOMOTION

vocomotion.com - A Cappella Recording Studio and record label
BeatboxMics.com - Inventor of microphones for beatboxers.
DarkSideVoices.com - Dark Side of the Moon A Cappella

As seen in Mix Magazine, June 2010 issue!
vocomotion is offline   Reply With Quote