View Single Post
Old 6th January 2009   #22
vocomotion
Gear maniac
 
vocomotion's Avatar
 
Join Date: Aug 2002
Location: Chicago, IL
Posts: 285

Thread Starter
Subfloor is done. Three layers (Kinetics SR floorboard, 1/2" plywood, and 1/2" plywood). I put in 700 screws in the floor to secure the two layers of plywood together. It really locked it up. The floor is floated on the SR floorboard and is separated between the Control Room and the ISO (as seen in the pics by the white Perimeter Isolation Board).

The contractors are coming tomorrow to start the first layer of drywall over the existing walls and to start framing. I'll be out of town for the rest of the week, so I'll post pics Sunday with what they got done this week.


--> freddie
Attached Thumbnails
VOCOMOTION - A Cappella Studio - Construction Thread-dsc_0055.jpg   VOCOMOTION - A Cappella Studio - Construction Thread-dsc_0057.jpg   VOCOMOTION - A Cappella Studio - Construction Thread-dsc_0058.jpg   VOCOMOTION - A Cappella Studio - Construction Thread-dsc_0059.jpg  
__________________
Freddie Feldman
VOCOMOTION

vocomotion.com - A Cappella Recording Studio and record label
BeatboxMics.com - Inventor of microphones for beatboxers.
DarkSideVoices.com - Dark Side of the Moon A Cappella

As seen in Mix Magazine, June 2010 issue!
vocomotion is offline   Reply With Quote