|
Hi Everyone,
Here are some shots of our current progress. The first layer of drywall is pretty much completed in every room. The construction team is now going to install the acoustic flooring, once the base concrete been leveled with self leveling cement. Then more drywall goes up, and then, even more. (It's very important to have stiff walls!)
Here are some photos of the control room and tracking room
The inside front walls of Studio A (with plenty of room for Charlie's new Duntech Sovereigns)
And finally the hallway between studios A and B
Sam Berkow should be coming for a visit, so I will have photos of that soon.
-Mike
|