Gearslutz.com - View Single Post - Airshow Mastering New Studio Construction
View Single Post
Old 15th November 2008   #11
Airshow Mike
Gear Head
 
Joined: Jul 2008
Location: Virginia
Posts: 64

Thread Starter
We Have Walls!

Hi Everyone,
Well, after much anticipation, the walls are finally going up. Things are now changing on a day to day basis, and the studios are taking shape. I will be posting updates more frequently from this point on, so please check back to see the progress.

In the attached photos you will see:

A worker bolting a metal stud to the floor

Isolated metal studs installed in the tracking room

A close up of a stud isolated via a sway brace

Another close up of a sway brace

A worker installing a ceiling stud that is isolated with Kinetics brand Wallmat

A close up of Wallmat attached to a stud

The bolt used in the Wallmat installation

The bolt inserted in a stud

And finally, the stud bolted in place


-Mike
Attached Thumbnails
Airshow Mastering New Studio Construction-dsc_6667.jpg   Airshow Mastering New Studio Construction-dsc_6669.jpg   Airshow Mastering New Studio Construction-dsc_6703.jpg   Airshow Mastering New Studio Construction-dsc_6717.jpg   Airshow Mastering New Studio Construction-dsc_6673.jpg  

Airshow Mastering New Studio Construction-dsc_6675.jpg   Airshow Mastering New Studio Construction-dsc_6676.jpg   Airshow Mastering New Studio Construction-dsc_6671.jpg   Airshow Mastering New Studio Construction-dsc_6695.jpg  
Airshow Mike is offline   Reply With Quote