I wanted the material flush with the front panel so I bought some long thin strips of wood and staple gunned through it into the frame to give a nice edge that is invisible from the outside.
As you can see, nice and flush with the front...
After that part it was a downhill run, I just had to fit the insulation into the frames which was a snug fit as I'd deliberately undersized the frames by 5mm.
After stapling the fabric into the top sides I then decided to just sew the back up, it seemed like the easiest solution at the time and worked out really well.
And that's it. A finished product. I had a real deadline as my wife's 30th was coming up and I'd promised the apartment would be in order by the time that came around. So all in all it probably took me about a month and a half to get them all done, it was really a lot more work than I'd bargained on but definitely worth it in the end.
