Quote:
Originally Posted by Glen Rushmore View Post
It takes shape!


Michael do you kept the pipes longer than necessary and cut them off later?
They look pretty long.

What kind of cable do you pull thru the pipes?

Can't wait to see the roof!
The pipes are kept longer than they will be in the end. As soon as the concrete is dry we'll cut them off to about 2" above the concrete.

I am changing the patchbay from a 1/4" in the old location to TT here, so I can't use ANY cables from the old studio. I am getting Mogami cables from RedCo with a DB25 on one end (patchbay side) an nothing on the other end. We then pull the cable through the pipes and I will swing the soldering iron for a few weeks to put the proper ends on the equipment side.

Clueless
my construction is a far cry from the amazing studio that you are building. There will only be a split concrete slab on top of the gravel. It is going to be about 4" thick and about 1' thick on the outside perimeter and where the split is, to support the walls.

What size pipe is that in your picture and where did you find those cool shallow knees?
mwagener is offline   Reply With Quote