Quote:
Originally Posted by mwagener Pipe day
I was a bit nervous about having all the measurements right, but it worked out fine. The 4x6 is the split in the concrete between the control room and tracking room, that piece of wood will be taken out as soon as the concrete is dry. Putting down the Vapor barrier was the last act of the day. Monday the inspector is coming in and then we can pour the concrete. |
It takes shape!
Michael do you kept the pipes longer than necessary and cut them off later?
They look pretty long.
What kind of cable do you pull thru the pipes?
Can't wait to see the roof!