| I am very aware of the limited budget. Yes, it could totally be done in stages.
The main things that will need to happen within that budget are:
1. Facility Design
2. Construction
a. Demolition of existing space.
b. Framing.
c. Hanging of all sheetrock/ insulation
d. Painting / trim
e. Flooring (laminate)
f. Hanging of all doors
g. Rerouting all the existing ductwork.
h. Electrical
All the audio equipment, furniture, wiring will be done out of another budget. I know it can be done. Just looking for the right person. I know that it rules out the big facility designers.
Thanks again for any help. |