View Single Post
Old 1st August 2008   #3
Roy Harter
Gear Head
 
Join Date: Jul 2007
Location: New York
Posts: 66

Thread Starter
Send a message via AIM to Roy Harter
I am very aware of the limited budget. Yes, it could totally be done in stages.
The main things that will need to happen within that budget are:

1. Facility Design
2. Construction
a. Demolition of existing space.
b. Framing.
c. Hanging of all sheetrock/ insulation
d. Painting / trim
e. Flooring (laminate)
f. Hanging of all doors
g. Rerouting all the existing ductwork.
h. Electrical

All the audio equipment, furniture, wiring will be done out of another budget. I know it can be done. Just looking for the right person. I know that it rules out the big facility designers.
Thanks again for any help.
__________________
Roy Harter

Skinnyman
Owner
1501 Broadway
Suite 2015
New York, New York 10036

t. 212-231-9797
f. 212-231-9777


Roy Harter's Myspace
Follow Roy on Twitter
Roy Harter is offline   Reply With Quote