Quote:
Originally posted by cajonezzz The existing floor is concrete in our new building.....the Auralex feet are $$$ but i was at a loss as to what else was out there.
Dave, i'd love to find an option as you did for cuting your own lil rubber feet..Did you just look up "industrial belt supply" in the yellow pages?
which insulation did you go with between the studs?
I'd love to see any pics you may get of your construction process BTW. |
I'll try to find the pictures - a lot of them were done with my wife's old camera, which is out of focus, and then at some point I got more interested in finishing the thing than in documenting...
But essentially, I did look up the number for the rubber guys in the Yellow pages.
The studs were filled with simple R-11 insulation, and I had cross braces set at random intervals to help avoid potential cavity resonance (if there is any with the voids insulation filled).
By the way, m wire runs are spaces which were not left open - that is, filled with insulation. If I had to do it again, I would have used 2x6 material for at least the control room floors to give myself both more room for wires and to allow for air conditioning to go into the producers desk and wall racks. I think you've said that you've done this before, so you already know that however big your conduits are, they probably won't be big enough...