more photos.. moving along now!!



Fire Hose Reel moved to go on outer wall..



Insulation Delivered.



New woven style insulation - I'll post specs and type etc shortly!



Roof/Ceiling is constructed with 2 x layers of beams - one for the internal ceiling and one for the roof capping. Once beam sits on the internal wall and one sits on the external wall - the basic "box within a box" concept.



All plaster is sitting on rubber strip around the base and a foam beading between walls and ceiling sheets. 16mm Firecheck plaster plus BarrierBoard plaster will be added will go on top (extra levels will be added to the recording studio and control room.



Live Room taking shape.







Rest of the ceiling beams delivered and ready to go up next week.. Insulation next before outer walls are plastered then barrierboard added as well.



Height differences.. Live Room (5.5m internal), Rehearsal Studios (3.5m internal),Control Room (4.5m internal) approx sizes.