week 9

Thanks Stick - we're really happy the way the floor turned out. It actually looks even better in reality...
Regarding the doors I would say bulletproof is underestimating their capabilities - we ordered them to withstand acoutic nightmares!!

This week was the last week of construction (at least the dusty dirty part of it):
Drywall builders left on Wednesday and HVAC was also finished this week. Some parts of the electric installation still needs to be finished - including final measurements of the CAT cables for the LAN. HVAC will go 'on air' next week after the electric instalation is finished.
DSL modem, Wireless LAN and the FTP server have already been setup. The file server should arrive next week. We finally received our shipping from sterling modular, which took a lot longer than we thought because of all the terror paranoia - for some reason US authorities are also concerned when goods leave the country, don't ask me...
Finally - as I'm writing this there should be some basic cleaning going on so from now on we should be clean.

Still missing/to do's:
* windows should get installed next week
* the carpenter has to install and build the acoustic panels (he allready started this week)
* some of the studio walls need a final layer of paint, some parts need laquer...
* all sorts of patch bays and panels need to be soldered, furniture and equipement needs to be built, moved or installed.

Here are some pics of last week:

* 5.1 Control without acoustics
* Entrance - almost done
* HVAC ducts outside
* Philipp installing the FTP Server
* Sterling Modular shipping arrived!!
Attached Thumbnails
studio-construction-slutz-only-sunshine-mastering-vienna-week-9-control-room-1.jpg  studio-construction-slutz-only-sunshine-mastering-vienna-week-9-entrance-1.jpg  studio-construction-slutz-only-sunshine-mastering-vienna-week-9-hvac-1.jpg  studio-construction-slutz-only-sunshine-mastering-vienna-week-9-server-1.jpg  studio-construction-slutz-only-sunshine-mastering-vienna-week-9-sterling-modular-1.jpg  

__________________
Mischa Janisch

Sunshine Mastering
Studio Construction - Photo Diary
mischa janisch is offline   Reply With Quote