week 8

cables:

actually most of this was done by me and philipp during christmas break - a great guy and tech who works for us.

* throughs (unfinished)
* main soundlock - without computer floor
* throughs (half finished) - this was done this week
* cables on their way
* into the machine room
Attached Thumbnails
studio-construction-slutz-only-sunshine-mastering-vienna-week-8-cables-1.jpg  studio-construction-slutz-only-sunshine-mastering-vienna-week-8-cables-3.jpg  studio-construction-slutz-only-sunshine-mastering-vienna-week-8-cables-4.jpg  studio-construction-slutz-only-sunshine-mastering-vienna-week-8-cables-5.jpg  studio-construction-slutz-only-sunshine-mastering-vienna-week-8-cables-6.jpg  

__________________
Mischa Janisch

Sunshine Mastering
Studio Construction - Photo Diary