First layer of the mastering room ceiling almost done. Second layer is 19mm plywood to support all the acoustic treatment and HVAC ducts - third layer is gypsum board again (No pics, but they should have finished since I left).
The other pictures are of the 5.1 control room - floating floor construction and some pics of the primary ceiling construction.
Last pic is of the future Edit room - now Rockwool storage room.
