First layer of the mastering room ceiling almost done. Second layer is 19mm plywood to support all the acoustic treatment and HVAC ducts - third layer is gypsum board again (No pics, but they should have finished since I left).

The other pictures are of the 5.1 control room - floating floor construction and some pics of the primary ceiling construction.

Last pic is of the future Edit room - now Rockwool storage room.
Attached Thumbnails
studio-construction-slutz-only-sunshine-mastering-vienna-ceiling-11.jpg  studio-construction-slutz-only-sunshine-mastering-vienna-floating-floor-3.jpg  studio-construction-slutz-only-sunshine-mastering-vienna-control-room-ceiling-1.jpg  studio-construction-slutz-only-sunshine-mastering-vienna-control-room-ceiling-2.jpg  studio-construction-slutz-only-sunshine-mastering-vienna-rockwool-1.jpg  

__________________
Mischa Janisch

Sunshine Mastering
Studio Construction - Photo Diary
mischa janisch is offline   Reply With Quote