View Single Post
Old 9th September 2007, 10:08 PM   #142
EduardoApolonia
Gear maniac
 
EduardoApolonia's Avatar
 
Join Date: Jul 2002
Location: Almancil, Portugal
Posts: 261
3rd layer in both rooms is finished

Pics













Here is a pic of the small machine room where the Voltage Regulator, UPS and maybe the computer will stay




here is the air duct box in the control room that connects to the small machine room (this box will have to be extended because the basstrap will cover this box)




and here is the other end on the ceiling of the machine room




Next, the remaining windows will be installed and the wall basstraps will be built
EduardoApolonia is offline   Reply With Quote