The doors are installed.
It was not a easy task. It took 3 guys to carry the doors and install them.
Then the 1st layer of the recording room ceiling was done.
It took a lot of time to put the rockwool, they had to do a lot of cuts.
They just need to put 2 pieces and tape the drywall before the plywood layer.
Here are some pics of the Rockwool. It should be enough for the whole recording room.
And here a pic of the drywall for the 1st layer of both rooms I had to buy 13mm instead of 15mm, I would have to wait more 2-3 weeks, so I got the 13mm they had in stock, the 15mm one will come on time for the 3rd layer.
On the bottom is part of the particleboard needed for the walls 2nd layer
Pics of the ceiling layer